We visited on Saturday (2Feb) and noticed that most of the wiring was in place and the plaster was complete with top colour coats.
On Monday morning we visited the house again and discussed the final positioning of the lights over the kitchen bench. All is looking good and by the end of today the pre-wire will be complete. A false wall is to be fitted inside the security room to hide the waste water pipe and provide a duct for the cables into the room.
This week the insulation will be installed (starting today?) and the colour on the Stria board may be on. Once the painting is finished the gutters can be installed and the scaffolding removed.
 |
| Telecommunications cabinet - with TV Coax cables |
 |
| Security Room with data (left) and security (right) cables. |
 |
| Bathroom switches and heater (top) |
 |
| Power board - located in store room. |
 |
| View from across the Karamu Stream |