I found the Google map of the area has been updated and shows the house with the scaffolding up.
Google Map
 |
| Painter at work |
This visit was to design the wardrobe shelving and rails, finalise the design of the kitchen and decide how the bath is to be placed. There is a problem with the supplier of the bench top and the top will be made in Palmerston North.
The wardrobe design was easy, as was the positioning of the bath. The kitchen layout was by the use of full sized templates laid on the floor. The only change was the location of the basin.
The Stria board was being painted while we were there and there is a day or two of work to finish that colour. The interior walls have been plastered and sanded and most of the door frames and architraves are installed. Still to do are the skirting boards and scotia in the garage. Some doors are hanging and the stairwell door has been installed with a cut out for the wrong latch.
 |
| Stairs |
 |
| Bed1 view - builders arrived to start a build |
 |
| Our view |