A extra window has been added and the size of a few windows have been changed. This is as a result of a review by Design Builders and us once the framing was up. Being able to make these changes at this stage of the build was appreciated by us. The additional window in the lounge makes the room much more attractive and livable in.
The building wrap is going on and will be completed in a day or two.
On Friday we spent 3 hours onsite with Merv sorting out the electrical, data and TV wiring.
Thursday, November 29, 2012
Thursday, November 15, 2012
Roof going on
Our last visit to the house was on Friday 2 November. This visit was to review the window sizes and locations with the framing all standing up. We made some decisions on a few changes and knew that not much would happen until the roof was on.
Today Josh sent us an email with some photos showing the roof installed on the lower level. The rest of the roof should be on in a day or so. Our next visit is on 23 November for a roof shout or a combined roof shout with 3 other owners whose building is a few weeks in advance of ours.
Today Josh sent us an email with some photos showing the roof installed on the lower level. The rest of the roof should be on in a day or so. Our next visit is on 23 November for a roof shout or a combined roof shout with 3 other owners whose building is a few weeks in advance of ours.